Topic: JIT Bonus #4: Digging into the Details of a Complex Project
In Just-in-Time Planning, we deliberately take a high-level view and set high-level goals, without digging into the details. That is specifically to ensure you don't get overloaded as you get an overview and determine the overall strategy. But ya gotta deal with the details sometime! In this class, we'll talk about how to keep track of the details without getting overloaded or bogged down. We'll discuss:
- The necessity and real risks of digging into details
- The role of hierarchical lists
- How to figure out which details need attention now
- The role of systems and standard operating procedures